Inspection of engineering systems. Inspection of engineering systems: comprehensive audit services of building engineering networks Defects in building engineering systems

Price for inspection of engineering networks and systems

To clarify the final cost, call the number provided for consultation with our specialists.

The final price of work is determined based on:

  • type of utility networks;
  • complexity of the equipment used;
  • quantity and availability of equipment.

Inspection of engineering systems is required:

  • in case of regular accidents;
  • in case of deviation in operating mode;
  • when controversial issues during the design, installation and operation of equipment.

What is a utility network survey?

This is a series of actions aimed at thoroughly checking and assessing the technical and operational condition, functionality, presence of defects and damage to part or the entire network, and compliance with all accepted standards. Also carried out before implementation into the network additional equipment to get an accurate answer whether the rules and regulations, as well as the characteristics of the system, will allow it to be supported safe mode work.

We conduct such surveys of systems and networks using special equipment, buildings, internal and external networks, equipment are checked in accordance with all accepted rules regulatory documents. This allows us to determine the possibility of their further operation or improvement, making it possible to determine the need for repairs in a timely manner, which will allow us to avoid any emergency situations and save money on the complete replacement of equipment.

When we conduct a technical inspection of engineering systems in Moscow:

  • If it is necessary to determine the wear and tear of equipment and the network as a whole, which will help in the timely resolution of problematic issues that arise
  • If it is necessary to determine the possibility of repairing and restoring the utility network
  • During a comprehensive assessment of the entire building of the enterprise for examination project documentation
  • To determine the feasibility of increasing the load on equipment
  • To draw up a task for documentation on improvement, modernization and repair engineering systems

Our proposal for surveying building utility networks:

Examination is one of the most labor-intensive processes, which requires highly qualified personnel and an extensive base of instruments and equipment. SoyuzTechService LLC offers its clients to conduct an examination in Moscow and the region for the following objects:

  • heating systems, cold and hot water supply;
  • sewerage and water supply;
  • ventilation and air conditioning systems;
  • power supply systems.

The examination is carried out as quickly as possible. This became possible thanks to the use of modern diagnostic equipment and computer analysis. In the process, we perform the following work:

  1. Search for hidden leaks, search for underground communications, search for illegal tappings, assessment of the residual life of pipelines.
  2. Diagnostics of equipment serviceability with quality control of installation and commissioning works.
  3. Investigation of networks to detect deviations from normal operation and other faults.
  4. Generating an examination report with recommendations regarding all stages of the work performed.

A more detailed description of the examination of utility networks in Moscow and the region:

  • We conduct a thorough inspection of pipelines and components of hot water supply, which includes Full description the entire system, inspecting pipes and pumps, taking all necessary measurements using special tools(this includes measuring the temperature state of the system, analyzing deposits in the pipeline, etc.). Drawing up a detailed report on all work performed and identified problem areas. We are also engaged in eliminating these problems, which will allow you to save time searching for other services to solve problem situations that have arisen.
  • We carry out an examination of heating systems, which includes a detailed examination of the inlet pipeline and central heating point, checking all heating devices, taking measurements using equipment, analysis useful diameter pipes, as well as providing options for solving problems with each of these sections, if any. We will be able to eliminate these shortcomings at a low cost, because... at complex works we will make a discount.
  • We evaluate cold water supply pipelines, which includes the same elements as when inspecting hot water supply, and also provide services for repairing, cleaning and restoring the original diameter of pipes.
  • We carry out an examination sewer networks which includes a full inspection of pipes and all connected equipment, inspection of ventilation, checking all angles of inclination to ensure compliance with optimal requirements, and also provide services to solve all these possible problems.
  • We check the ventilation systems of buildings, carefully inspect all air ducts and equipment, use instruments to measure the correctness of air exchange between all parts of the building, identify and solve all problems that arise.
  • We carry out an examination of electrical networks, check all devices, cabinets, cables, low-current networks, and carry out repairs if necessary.

For directors and other high-ranking representatives of the population of the third planet from the sun


Upon completion, the customer will be issued a certificate and conclusion. As well as confirmation of completed work.

Utility network survey cost calculator
Select building type

Retail buildings Retail MFC Administrative Industrial Warehouse MFC Residential buildings

M2:

Survey
Design cost calculation
Price design work by main sections
from 10,999 m2, Vstr=31,892 m3
Settlement and explanatory note0 0
Analysis executive documentation, drawing up a list of defects, photographing the object of examination0 0
Power supply system, photographic recording0 0
Cold water supply system, photographic recording0 0
DHW water supply system, photographic recording0 0
Drainage system, photographic recording0 0
Heating, ventilation and air conditioning, heating networks, photographic recording0 0
Communication networks, photographic recording0 0
Gas supply, photographic recording0 0
Measuring the strength of concrete using the ultrasonic method0 0
Performs opening of structures, sampling of concrete, determination of composition and reinforcement0 0
Development of building plans in PDF format based on BTI0 0
Development of plans for the placement of elements of the internal engineering systems of the building (risers VK, OV, placement of ASU, placement of utility inputs)0 0
Determination of geological conditions of the construction site (properties of foundation soils)0 0

  1. Sample for design and survey work - KP, TZ, ESTIMATED technical inspection of engineering systems up to 1500 m2
  2. Sample for design and survey work - KP, TZ, ESTIMATED technical inspection of structures up to 1500 m2
Inspection of utility networks of wastewater treatment plants

Inspection of wastewater treatment plants- begins with compilation terms of reference. Travels to sites Chief Engineer or CEO, appointing specialists responsible for specific work. At the end, a detailed plan will be drawn up, including research results, a list of equipment with recommendations for use and, of course, modernization details.

Water supply system inspection

Water supply system inspection- a set of measures aimed at clarifying the actual and obsolescence engineering water supply system. Includes detailed visual inspection specialists, control using specialized equipment and calculation work. Upon completion, a research report is drawn up detailing the results, recommendations, best practices modernization and maintenance.

Electrical networks survey

Electrical networks survey- usually initiated by the company upon the fact of excessive electricity consumption or the occurrence of an emergency. Networks, electrical installations, and input devices are directly inspected. Based on the issued conclusion, actions are taken to improve, repair, and dismantle systems.

Utility network survey ventilation ducts

Inspection of ventilation ducts- this includes checking design documentation and working calculations to assess the feasibility of the installation. Monitoring of the system, air channels and components. Finally, if necessary, recommendations are given to effective use, repair or modernization.

Ventilation system inspection

Ventilation system inspection– comes down to measuring parameters (air flow speed, transparency, amount of suspended particles, humidity) and comparing the obtained data with the calculated data for a specific system. In case of a significant discrepancy, the system is examined for improper operation of units and components.

Ventilation inspection report

Ventilation inspection report– includes data shown by calculations when designing the system and practical parameters of the operating system. If there is a significant discrepancy between the parameters, measures are indicated to align them.

Exhaust ventilation in production

Exhaust ventilation in production– is extremely necessary for pumping into the room the required amount of clean oxygen-saturated air, removing production products harmful to human health outside the working area. The most optimal option of all possible ventilation systems for most types of production.

Validity period of engineering surveys– defined by law as 2-3 years. Results with a period of more than 3 years are included in the history of engineering surveys and are necessary for the conclusion of a repeated reconnaissance study.

Obtaining GPZU, SPOZU in Moscow

Obtaining GPZU, SPOZU in Moscow– perhaps in the Committee on Urban Planning and Architecture in the city of Moscow, or in the Moscow Committee for Architecture.

First of all, you will need to collect a package of confirmed papers. Term of provision of services from the moment of submission of documents to issue: 30 days.

What is GPZU, SPOZU

What is GPZU, SPOZU– a set of documents prepared accordingly by the responsible person, Planning Organization Scheme land plot or as an abbreviation. Describes in detail the special purpose of a specific territory, characteristics and possibilities for construction.

Samostroy

Samostroy- a structure erected without proper permitting sanctions and approvals. In places not intended for this.

How to legalize unauthorized construction

How to legalize unauthorized construction– you should start by calling a commission from the local authorities of the municipality. Which will issue the necessary confirmations. The decree legitimizing the construction will be obtained directly from the arbitration court.

Legalization of unauthorized construction

Legalization of unauthorized construction- we apply the latest research and achievements both technically and legally, so that you have the opportunity to solve the problem with minimal effort.

Temporary structure, definition

Temporary structure, definition– structures and buildings are recognized that can be moved without causing disproportionate damage. Integral structure, not connected to the ground and engineering communications, which does not have a rigid foundation, which is not possible to free without destroying the structure.

List of documents for putting the facility into operation

List of documents for putting the facility into operation– this includes: an application from the developer and investor for the issuance of documents for putting the facility into operation, confirmation of acceptance, a document approving the parameters of the constructed facility in accordance with the current regulations. Papers confirming the compliance of the erected building with the technically approved project.

The procedure for registering land ownership

The procedure for registering land ownership– statements describing the purpose of acquiring rights to the site, a supporting document indicating perpetual use or lifelong ownership and justifying reason. An extract from the household register, an act on the receipt of land, is issued by the local government body. One document confirming the owner of the land. Confirmation of payment of state duty and passport of a citizen of the Russian Federation.

Composition of the redevelopment project

Composition of the redevelopment project– includes: diagram of partitions, reinforcement of openings. Water supply, sewerage and heating systems.

Plan before work begins. Measures to ensure industrial and fire safety. Confirmation of the project manager.

Cost of the redevelopment project

Cost of the redevelopment project– includes the cost of drawing up a design, sketch and working design.
Author's supervision.
A significant part is the preparation of the necessary documents.
Premises redevelopment project– pursues the goal of ensuring complete structural safety of engineering systems, operational characteristics and structures of the structure. Project design standards are regulated in accordance with GOST 21.101-97 and GOST 21.501-93.
Development of a redevelopment project– begins with the provision of documents from the Bureau of Technical Inventory and a sketch of the redevelopment.

Mezzanine

Mezzanine- in global practice, an additional room built into the main mass of a building, in Russian architecture - a shelf in the upper part of the room used for storing homemade scrubs.

Sample of an object inspection report

Sample of an object inspection report- will be filled out by members of the commission that examined the property and made a conclusion. Recording data in the survey report.

Property survey report– a document confirming the readiness of the property for operation. Compiled in relation to newly erected and renovated buildings. Compiled by an authorized commission of administrative authorities. Has the task of improving the overall picture of construction.
Sample certificate of inspection of buildings and structures- a document confirming the inspection of the structure by a group of persons. To carry out the next inspection of the building, only competent persons must be involved, who are obliged to assess all identified deficiencies in the building.
Sample building inspection report– cannot be used as a supporting document. Useful to familiarize yourself with the formal rules for filling out reports.
Inspection report building structures – confirms monitoring and inspection of the condition of building structures and structures. If a defect is identified that cannot be eliminated without dismantling the structures, a separate act eliminating the defect.

Control of building structures

Control of building structures- carried out upon the construction of a building or structure. Subsequently, scheduled or unscheduled testing takes place in the presence of a competent commission with registration of the results. And entering data into current documentation for further analysis.

Expert opinion sample document– used for the initial conclusion. Can be used as secondary confirmation, not suitable as a final expert opinion.

Examination of buildings and structures

Examination of buildings and structures- aims to determine the residual life and technical condition of buildings and structures. Assessment of the extent to which the constructed structure meets the requirements and the extent to which it complies with industrial safety requirements.

Act technical inspection - carried out to confirm the technical inspection of the building. In order to safely operate a building, a commission of authorized members is required to confirm that the building is ready for use.
Building inspection report, sample– can be downloaded on the website of our organization. Used as a draft version of a document submitted to the competent authorities for greater accuracy and reduction of errors.
Certificate of inspection of buildings and structures- records the state of the object at the present specific moment. It lists the defects in detail. All changes are recorded in writing, after which the document is certified by the customer and interested third-party organizations. Does not reflect the overall technical condition.
Construction site inspection report– compiled at the time of a scheduled or unscheduled inspection of a construction site to identify technical details and compliance technological operations technical specifications.
Defecation certificate form– is necessary exclusively in cases where a significant defect in the design of a building or structure is found. The form can be downloaded from the website of the local Rostekhnadzor authority.
Defect report– a document certifying that a building or structure cannot be used for its intended purpose. It has severe defects and needs serious repairs. Compiled by an authorized commission of specialists.
Opening in a load-bearing wall cost - the price consists of the complexity of the technical implementation. The material of the wall, brick, monolithic concrete or a panel house. Based on the material, the tool is chosen. Depending on the chosen tool and the classification of specialists, the final figure is added up.

Opening strengthening project

Opening strengthening project– is developed by design organizations - members of the SRO or the authors of the building project. According to housing legislation, openings in load-bearing walls significantly affect safety. Therefore, they must be properly registered with the Moscow Housing Inspectorate.

Gain metal beams

Strengthening metal beams- can be local or general. Local reinforcement due to welding of additional stiffeners. General - creation lower belt trusses, removing the reference voltage.

Concrete examination

Concrete examination- reconciliation of the actual quality of the product with the characteristics shown in the design documentation.

The highest quality strength measurements are carried out using concrete cores removed from the finished structure.
Determination of concrete strength- it is possible to determine by destructive testing, indirect non-destructive and direct non-destructive. Ultrasonic testing. Regardless of the method or equipment, the measurement error is never less than 30%.
Concrete testing laboratory– concrete is a complex composition, and therefore an analysis of each component is necessary for assessment. The laboratory selects the required composition of concrete depending on the technical specifications, as well as the composition of gravel, cement, and sand. Determination of vibration properties and reinforcing bars.

Methods for quality control of welded joints

Methods for quality control of welded joints– distinguish between destructive control methods. A model of the welded product is subjected to mechanical tests. AND unbrakable control: visual, pneumatic and hydraulic tests. Magnetographic and X-ray control.
Ultrasonic testing.

Flaw detection laboratory– a set of tools and methods aimed at performing flaw detection inspection by all accessible ways: destructive and non-destructive testing, ultrasonic testing, visual testing, etc.. Engaged in the development of methods for identifying defects and creating devices for practical use based on their principles.
Checking the quality of welds– There are several types of welds, depending on the purpose, the quality also varies. Accordingly, control methods.
Checking Welded Joints– carried out after cooling, may vary depending on the purpose of the connection. There are visual, ultrasonic and x-ray inspections.
Welding control– visual, ultrasonic or x-ray method of examining the result of welding work. To check the quality of the connection.

Design of buildings and structures

Design of buildings and structures– carried out on the basis of technical specifications, geological conditions and regulatory acts and laws.

Project documents undergo multiple checks through authorities and regulatory authorities and are approved only after general agreement.
Building project– a graphically and mathematically simulated and documented model of a building, used to create estimates and more detailed elaboration of operations during the construction of a building.
Construction design – development of the most optimal technological process in accordance with economic models, given technical specifications and its geological capabilities.
Design of building facades– calculation and graphic work, as well as a general and sectional plan of the building facade, taking into account the specific site and the specifics of its operation and construction.
Building design price– design cost, a complex set of key costs (work of specialists, costs of work, etc.)
Building design cost– the total cost of creating a project with the participation of technical specialists and developing solutions. As well as overhead, legal and other expenses.
Typical projects– we finalize, clarify and rework standard projects to suit your tasks, technical solutions and wishes. A standard project is usually the basis of all private projects to reduce repetitive work.
Shopping center project– compiled taking into account supply chains, human flows, and city communications. Closely integrated with the economy of the residential area and infrastructure facilities.
Project working documentation, a working project is a set of transitions, operations and plans from different angles for the production of specific technical actions (masonry, finishing, facade plan, sectional plan).
Project documentation what is it– a set of graphic and calculation materials that make up the apotheosis preliminary work in preparation for the construction of buildings and structures.
Object design industrial purposes - similar to other types of design, but taking into account financial and estimate analysis, calculations of product sales. Design with implementation of all possible measures for the successful implementation of the project.
Production design- in accordance with the requirements of regulatory and technical acts. Based on usage production equipment and materials. The basis is a project developed specifically for you, taking into account the preferences and recommendations of the customer. No standard solutions.

Measurements

Measurements– a set of actions aimed at accurately measuring the dimensions of a room (width, height, volume, area). Necessary for repairs, cost assessment installation work. When installing communications, cosmetic repairs and other actions.

Premises measurements– the primary procedure is integral during inspection, repair, and redevelopment. Other technical or legal actions regarding the premises.
Room measurements cost– this includes the cost of paying specialists, overhead costs and equipment depreciation. And also the price varies significantly depending on the size.

Offer other types of cooperation. Fine!

Service " Technical audit of engineering networks» is a set of diagnostic measures that are necessary to record information about possible operational irregularities engineering equipment. Based on this data, a plan is created for the reconstruction or replacement of certain parts of the engineering system. In the long term, this measure helps prevent accidents and breakdowns.

Inspection of utility networks includes 4 types of work:

  1. Visual inspection and assessment of the technical condition of utility networks

    This block of work includes a visual inspection of the structural features of the building and its engineering systems. At this stage, specialists identify damage, on the basis of which a defective list is formed. Staff and representatives of contractors are also interviewed to obtain the most objective data possible.

  2. Checking the compliance of actual qualitative and quantitative parameters with those recommended for a given class and type of building

    The second stage of work is carrying out a series of measurements to determine key technical parameters and recording the survey results. The obtained data is compared with acceptable values, and violations are identified.

    What parameters are checked for compliance with standards?

    • indoor air temperature in summer - 23–25°C, in winter - 22–24°C;
    • air humidity 40–60%;
    • circulation of air masses 60 m 3 / h per 10 m2;
    • air exchange in the workplace - 0.13–0.25 m/s;
    • illumination - 300–500 lux;
    • The noise level should not exceed 55 dB.

    During audit The following measuring instruments are used:

    • Thermal imager - helps to identify defects in the thermal protection of a building.
    • Current electric clamp - measures current strength.
    • Multimeter - measures voltage, resistance, current.
    • Sound level meter - measures the noise level.
    • Pyrometer - measures surface temperature.
    • Anemometer - measures speed air flow V closed systems and on open area(measurement of air flow speed inside air ducts).
    • PH meter - measures the level of hydrogen ions in the system.
    • Luxmeter - measures the level of illumination of the workplace.
    • A device for measuring CO2, temperature and air humidity.
  3. Analysis/reconciliation of current technical documentation

    The third block of work includes:

    • checking the availability of correctly completed documentation (in accordance with the register of documents that regulates the activities of operating organizations);
    • checking the availability of equipment documentation ( technical passports);
    • checking compliance with safety regulations, as well as the availability of logs and their correct filling;
    • analysis of concluded contracts with resource suppliers;
    • diagnostics of metering devices.
  4. Preparation of a detailed report with the results of the audit of engineering systems

    At the final stage, a report is drawn up with conclusions on the fact of the comprehensive inspections of utility networks.

    The report consists of the following documents:

    • conclusion with the inspection results and assessment of the technical condition of each of the engineering systems separately;
    • defective list with photographs and a detailed description of the defects, with the timing and estimated cost of elimination;
    • Conclusion with the results of measurements of premises parameters, highlighting non-compliance with acceptable standards;
    • reconciliation report on the presence/absence of mandatory executive and technical documentation at the site. Recommendations for the quality of management operational logs;
    • determination of compliance or non-compliance of engineering systems with fire safety, electrical safety, sanitary, epidemiological and environmental standards;
    • conclusion on the operation of metering devices and recommendations for reducing the cost of resource consumption.